Golden Triangle - Livermore |
|
The Amphitheater takes shape
Theater gets more brickwork
4/7/07
From back to front:
The 500 seat performing arts theater
The fountain (concrete)
Stage for outdoor amphitheater (right in front of the fountain)
Courtyard area
Terraced seating area (wood forms for concrete)
View of the courtyard and amphitheater area. From right to
left:
The fountain (concrete)
Stage for outdoor amphitheater (right in front of the fountain)
Courtyard area
Terraced seating area (wood forms for concrete)
View of the terraced seating area, with the Fire and Ice
restaurant behind. 4/7/07
The view from near 1st Street. The planters now have brick
installed. 4/7/07
The performing arts theater, with more brick installed.
4/7/07
A view from the fountain area (the performing arts theater is
behind me).
The close form is for the stage of the amphitheater. The forms toward the
back are for the terraced seating area.
4/7/07
The performing arts theater, taken from the parking garage.
The brick is pretty much finished on this side. 4/7/07
Taken from Railroad Ave, by Livermore Ave. 4/7/07
Taken from Livermore Ave. The brickwork is still being
installed on the west side. 4/7/07
Links:
Livermore
Performing Arts