Golden Triangle - Livermore |
|
The Plaza
The scheduled completion date for the plaza is
May 5, 2007.
There will be several fountains. In the photo below, the concrete
structure on the right is a fountain.
The far left will be other fountains.
The circular area in the photo below (lower left) is a planter. In the
center is a man-hole for a storm sewer pipe that ran through the property before
any construction. It requires several accessible man-holes, so there are
two of these planters.
The Plaza Area. 3/11/07
The plaza area, slightly different shot.
3/11/07
Progress on the theater.
3/11/07
The plaza in relation to the theater.
3/11/07
More forms, about ready for concrete. This is right next to the "Fire and
Ice" building
3/11/07
Links:
Livermore
Performing Arts