eLivermore.com - By Bill Nale

 

Golden Triangle - Livermore
Page 24 - Theater Plaza

Back to: eLivermore.com Home Page  -  Main Photos Page  -  Livermore Sites Page

 

Previous Page

Bankhead Theater Main Page (including performance schedules)

Next Page

     
 

Back to Photo Contents Page

 

The Plaza

The scheduled completion date for the plaza is May 5, 2007.
There will be several fountains.  In the photo below, the concrete structure on the right is a fountain.
The far left will be other fountains.
The circular area in the photo below (lower left) is a planter.  In the center is a man-hole for a storm sewer pipe that ran through the property before any construction.  It requires several accessible man-holes, so there are two of these planters.


The Plaza Area.  3/11/07


The plaza area, slightly different shot.  3/11/07


Progress on the theater.  3/11/07


The plaza in relation to the theater.  3/11/07


More forms, about ready for concrete.  This is right next to the "Fire and Ice" building  3/11/07

 

Next Page

Links:
Livermore Performing Arts